Pre-Installation Checklist
BIOS configuration, disk controller modes, network interface identification, and boot media preparation.
By the end of this module, you will be able to:
2.5 hours (1 hour reading + 1.5 hours lab)
Pre-Installation Checklist
BIOS configuration, disk controller modes, network interface identification, and boot media preparation.
Controller Installation
Step-by-step installation of Node 1 (controller) and Node 2 (controller), including network configuration and cluster formation.
Adding Nodes
Scale-out nodes, storage-only nodes, and compute-only nodes — expanding your cluster beyond the initial 2-node deployment.
Post-Install Verification
Dashboard health checks, vSAN verification, network connectivity, initial configuration, and final deployment testing.
Lab: 2-Node Installation
Perform a complete VergeOS installation on a 2-node cluster using the Terraform playground or physical hardware.